Consulting Engineers  
  
 
 
 
 

 
 
HR Textron

Santa Clarita, 1999, Job No.: JN98106
Replacement of two existing R-113 chillers with two 400 ton R-134a water-cooled centrifugal chillers in chiller room, replacement of induced-draft cooling tower, installation of plate-type heat exchanger, all at grade, at manufacturing facility.
Services performed: mechanical and structural engineering and drawings for design-build project delivery.

Original 19C chiller control stand
Original 19C chiller compressor-motor
Original 19C chiller
control stand
 
Original 19C chiller
compressor-motor
 

 

Original chiller start-up sheet
Original chiller start-up sheet
Original condenser water pumps
 
Original chiller start-up sheet
(first machine in series
piping arrangement)
 

 

Original 19C chiller
Original 19C chiller suction elbow
Original 19C chiller
 
Original 19C chiller
suction elbow
 

 

Original cooling tower
Original cooling tower
 
 

 

 
 

 

Inland Empire Office
4805 North Sierra Way
Suite 115
San Bernardino, CA 92407
Phone: 909.534.3596

Coachella Valley Office
42600 Caroline Court
Suite 102
Palm Desert, CA 92211
Phone: 760.834.1537
Fax: 760.832.7333