Consulting Engineers  
  
 
 
 
 

 
 
Consolidated Film Industries

Hollywood, 1998, Job No.: JN98006
Replacement of two existing R-11 chillers with two 300 ton R-134a water-cooled centrifugal chillers, replacement of three cooling towers with two induced-draft cooling towers, all on rooftop steel structure, at film processing facility.
Services performed: mechanical and structural engineering and drawings for design-build project delivery.

 
 

 

Inland Empire Office
4805 North Sierra Way
Suite 115
San Bernardino, CA 92407
Phone: 909.534.3596

Coachella Valley Office
42600 Caroline Court
Suite 102
Palm Desert, CA 92211
Phone: 760.834.1537
Fax: 760.832.7333