Consulting Engineers  
  
 
 
 
 

 
 
Riverside Community College Chillers Replacement Project

Riverside, 1998, Job No.: JN97110C
- Bradshaw Student Center: Replacement of existing R-11 chiller with 110-ton R-22 water-cooled single screw chiller in chiller room at grade, at student center building., $ 500,000.
- Clock Tower Building: Replacement of existing R-11 chiller with 220-ton R-22 water-cooled single screw chiller and replacement of forced-draft cooling tower in third floor chiller room at classroom building.
- Library Building: Replacement of existing R-11 chiller with 150-ton R-22 water-cooled single screw chiller in chiller room at grade, at library building.
- Quadrangle Building: Replacement of existing R-11 chiller with 200-ton R-22 water-cooled single screw chiller in chiller room below grade, at classroom building.
Services performed: mechanical, electrical, structural engineering and drawings for state-funded public works competitive bidding.

Clock Tower original chiller and cooling tower
Clock Tower original chiller
Clock Tower original chiller
and cooling tower
 
Clock Tower original chiller
 

 

Clock Tower original pneumatic control panel and recent EMS panel
Clock Tower original cooling tower and discharge duct
Clock Tower original pneumatic
control panel and
recent EMS panel
 
Clock Tower original cooling
tower and discharge duct
 

 

Cosmetology original R-22 compressor
Cosmetology original multizone unit
Cosmetology original
R-22 compressor
 
Cosmetology original
multizone unit
 

 

Cosmetology original refrigerant condensing fluid cooler
Quadrangle Building replacement chiller
Cosmetology original refrigerant
condensing fluid cooler
 
Quadrangle Building
replacement chiller
 

 

 
 

 

Inland Empire Office
4805 North Sierra Way
Suite 115
San Bernardino, CA 92407
Phone: 909.534.3596

Coachella Valley Office
42600 Caroline Court
Suite 102
Palm Desert, CA 92211
Phone: 760.834.1537
Fax: 760.832.7333