Consulting Engineers  
  
 
 
 
 

 
 
2600 Wilshire Office Building

Los Angeles, 1995, Job No.: JN95121
Replacement of two existing chillers (R-11 and R-113) with one 75 ton R-134a dual screw water-cooled chiller and one 250 ton R-22 screw water-cooled chiller, replacement of one induced-draft cooling towers, in penthouse chiller room and rooftop, at office building.
Services performed:mechanical engineering and drawings for design-build project delivery.

 
 

 

Inland Empire Office
4805 North Sierra Way
Suite 115
San Bernardino, CA 92407
Phone: 909.534.3596

Coachella Valley Office
42600 Caroline Court
Suite 102
Palm Desert, CA 92211
Phone: 760.834.1537
Fax: 760.832.7333