Consulting Engineers  
  
 
 
 
 

 
 
Cine Castle Film Studio Building

Gilman Hot Springs, 1994-98, Job No.: JN94101.
Two story 60,000 sq. ft building with 25,000 sq.ft x 35 ft high main studio (soundstage); 1,500 sq.ft. second soundstage; support spaces including set construction, set storage, wardrobe, mixing rooms, etc. Four-pipe chilled water, hot water air handling units; built-up special fan systems for main studio with very low noise level criteria.
Services performed: mechanical and plumbing engineering and drawings for competitive bidding.

Soundstage building under construction
Soundstage building under construction
Soundstage building under
construction
 
Soundstage building under
construction
 

 

Soundstage building interior under construction
Large ductwork sections for soundstage air conditioning
Soundstage building interior
under construction
 
Large ductwork sections for
soundstage air conditioning
 

 

Large ductwork sections for soundstage air conditioning
Large ductwork sections for
soundstage air conditioning
 
 

 

 
 

 

Inland Empire Office
4805 North Sierra Way
Suite 115
San Bernardino, CA 92407
Phone: 909.534.3596

Coachella Valley Office
42600 Caroline Court
Suite 102
Palm Desert, CA 92211
Phone: 760.834.1537
Fax: 760.832.7333