| San Bernardino, 2012, Job No.: JN12009Click on any image below for a larger view.New high school campus.
 Services performed: Consultant to 3QC Enlightened Buildings. Commissioning services(Cx). The project is designed to Collaborative for High Peformance Schools (CHPS) 2006 criteria along with Enhanced Commissioning.
 Commissioning Agent: 3QC, Folsom, Irvine, San Diego.
 Architect: ATI, Riverside.
 General contractors: C.W. Driver (Site-built buildings), Pankow/CSL (PreFast modular classroom building).
 Mechanical contractors: Desert Air Conditioning (Site-built buildings), Integrated Mechanical (PreFast modular classroom building).
 
              
                |  |  |  
                | Construction phase -PreFast Classroom Building
 | Construction phase - PreFast Classroom Building
 |    
              
                |  |  |  
                | Construction phase - PreFast Classroom Building
 Rooftop Heat Pumps
 
 | Construction phase - PreFast Classroom Building
 Rooftop Heat Pump
 
 |    
              
                |  |  |  
                | Construction phase - Typical "Stick-Built" Classroom
 Building. Note exposed ductwork
 and daylight monitors.
 
 | Construction phase - Typical "Stick-Built" Classroom
 Building. Note exposed ductwork
 and daylight monitors.
 
 
 |    |