Consulting Engineers  
  
 
 
 
 

 
 

San Bernardino City Unified School District Middle College High School

San Bernardino, 2012, Job No.: JN12009
New high school campus.
Services performed: Consultant to 3QC Enlightened Buildings. Commissioning services(Cx). The project is designed to Collaborative for High Peformance Schools (CHPS) 2006 criteria along with Enhanced Commissioning.
Commissioning Agent: 3QC, Folsom, Irvine, San Diego.
Architect: ATI, Riverside.
General contractors: C.W. Driver (Site-built buildings), Pankow/CSL (PreFast modular classroom building).
Mechanical contractors: Desert Air Conditioning (Site-built buildings), Integrated Mechanical (PreFast modular classroom building).

Click on any image below for a larger view.

a
b
Construction phase -
PreFast Classroom Building
 
Construction phase -
PreFast Classroom Building
 

 

c
d
Construction phase -
PreFast Classroom Building
Rooftop Heat Pumps
 
Construction phase -
PreFast Classroom Building
Rooftop Heat Pump
 

 

c
d
Construction phase -
Typical "Stick-Built" Classroom
Building. Note exposed ductwork
and daylight monitors.
 
Construction phase -
Typical "Stick-Built" Classroom
Building. Note exposed ductwork
and daylight monitors.

 

 

 
 

 

Inland Empire Office
4805 North Sierra Way
Suite 115
San Bernardino, CA 92407
Phone: 909.534.3596

Coachella Valley Office
42600 Caroline Court
Suite 102
Palm Desert, CA 92211
Phone: 760.834.1537
Fax: 760.832.7333