Consulting Engineers  
  
 
 
 
 

 
 
Desert Aids Project Phase 4

Palm Springs, 2012, JN12001.
OSHPD 3 Licensed Primary Care Clinic
Replacement of rooftop gas-electric packaged A/C units with 4-pipe rooftop air handlers. Chilled water and heating hot water piping. Power and control wiring. Phases 1, 2, 3 included replacement of water-cooled chiller, cooling tower, and chilled water pumps.

Services performed: HVAC and plumbing engineering and drawings for City of Palm Springs plan check and public works competitive bidding.
Architect: Interactive Design Corporation.
Contractor: Retrofit Technology.

Click on any image below for a larger view.

a
b
Desert Aids Project
Phase 3
 
Construction phase -
Rooftop chilled water and heating
hot water piping
 

 

c
d
Construction phase -
New air handling units and
adaptor curbs
 
Construction phase -
Equipment rigging
 

 

e
f
Construction phase -
Equipment rigging
 
Construction phase -
Equipment rigging
 

 

g
h
New horizontal discharge air
handling unit on steel frame
 
New cooling tower
 

 

 
 

 

Inland Empire Office
4805 North Sierra Way
Suite 115
San Bernardino, CA 92407
Phone: 909.534.3596

Coachella Valley Office
42600 Caroline Court
Suite 102
Palm Desert, CA 92211
Phone: 760.834.1537