Palm Springs, 2012, JN12001.
OSHPD 3 Licensed Primary Care Clinic
Replacement of rooftop gas-electric packaged A/C units with 4-pipe rooftop air handlers. Chilled water and heating hot water piping. Power and control wiring.
Phases 1, 2, 3 included replacement of water-cooled chiller, cooling tower, and chilled water pumps.
Services performed: HVAC and plumbing engineering and drawings for City of Palm Springs plan check and public works competitive bidding.
Architect: Interactive Design Corporation.
Contractor: Retrofit Technology.
Click on any image below for a larger view.
|
|
Desert Aids Project Phase 3
|
Construction phase - Rooftop chilled water and heating hot water piping |
|
|
Construction phase - New air handling units and adaptor curbs
|
Construction phase - Equipment rigging |
|
|
Construction phase - Equipment rigging
|
Construction phase - Equipment rigging |
|
|
New horizontal discharge air handling unit on steel frame
|
New cooling tower |
|