Zzyxx, 2011, JN11019
Kitchen ventilation upgrade consisting of new Type 1 Captive-Aire hood, grease exhaust fan, makeup air unit, and Ansul fire suppression system.
Services performed: Mechanical, plumbing, electrical, and structural engineering and drawings for DSA and CSFM plan review and permit.
Structural Engineer: Tang Structural Engineering.
Mechanical Contractor: High Desert Metal Works.
Fire Protection Contractor: V-Fire.
Click on any image below for a larger view.
|
|
Desert Studies Center "Main Street" |
Desert Studies Center Cima Dry Lake |
|
|
Borregos across the road on day of job walk |
Pre-construction meeting with Cal State and prime contractor High Desert Metal Works |
|
Existing rooftop equipment |
|