Consulting Engineers  
  
 
 
 
 

 
 

Desert Studies Center, California State University, Mohave National Preserve, Zzyxx, 2011

Zzyxx, 2011, JN11019

Kitchen ventilation upgrade consisting of new Type 1 Captive-Aire hood, grease exhaust fan, makeup air unit, and Ansul fire suppression system.

Services performed: Mechanical, plumbing, electrical, and structural engineering and drawings for DSA and CSFM plan review and permit.

Structural Engineer: Tang Structural Engineering.
Mechanical Contractor: High Desert Metal Works.
Fire Protection Contractor: V-Fire.

Click on any image below for a larger view.

Desert Studies Center
Desert Studies Center Cima Dry Lake
Desert Studies Center
"Main Street"
 
Desert Studies Center
Cima Dry Lake
 

 

Borregos across the road
Pre-construction meeting
Borregos across the road on day
of job walk
 
Pre-construction meeting with
Cal State and prime contractor
High Desert Metal Works
 

 

Existing rooftop equipment
Existing rooftop equipment
 

 

 
 

 

Inland Empire Office
4805 North Sierra Way
Suite 115
San Bernardino, CA 92407
Phone: 909.534.3596

Coachella Valley Office
42600 Caroline Court
Suite 102
Palm Desert, CA 92211
Phone: 760.834.1537
Fax: 760.832.7333