Wolff-Waters Place (La Quinta Dune Palms)

La Quinta, 2006, JN06010
Twenty-three two, three and four story buildings consisting of 4 to 72 apartments each. Community building and laundry/shop building.
Building types: 12.
Total apartment units: 220.
Split-system air conditioning systems with dx cooling and combined hydronic/domestic hot water heating. Individual gas storage-type hot water heaters.
Services performed: Mechanical and plumbing engineering and drawings for
competitive bidding. Title-24 energy compliance. LEED Certification.
Architect: Interactive Design Corporation, Palm Springs.
Electrical Engineer: MRC Engineering.
Structural Engineer: Grayner Engineering.

Click on any image below for a larger view.

a
b
Construction phase -
Note rooftop penetrations flashing.
Counterflashing will follow.
 
Construction phase -
Community laundry building
 

 

c
d
Construction phase-
Community pool before plastering
 
Construction phase-
Day Care Center
 

 

e
f
Construction phase-
Rooftop condensing units
 
Construction phase - Drain, waste,
vent piping from apartments
above parking structure
 

 

g
h
Construction phase - Gas piping
serving apartments above
parking structure
 
Construction phase - Drain, waste,
vent piping in parking structure
after painting
 

 

i
j
Below grade parking structure
exhaust ductwork
 
Below grade parking structure
exhaust ductwork - Note typical
exhaust grill in wall and no duct
drops within parking structure.
 

 

m
k
Construction Phase - Over 200
apartment kitchen sink assemblies
were pre-fabbed off-site for
rapid installation in the countertops.  
Quality Assurance Phase -
Punch list in apartment bathroom
 

 

l
Quality Assurance Phase -
Punch list in apartment bathroom
 

 

 
 

 

Inland Empire Office
4805 North Sierra Way
Suite 115
San Bernardino, CA 92407
Phone: 909.534.3596

Coachella Valley Office
42600 Caroline Court
Suite 102
Palm Desert, CA 92211
Phone: 760.834.1537
Fax: 760.832.7333